Long Lake ADA/AAB Pathway

DEP Wetlands Protection CE 204-1002

COMPLETE as of 06.03.2024

The Littleton Parks, Recreation, and Community Education department obtained approval from the Park  and Recreation Commission to replace a section of the seasonal access mats with a permanent ADA/AAB pathway to ensure year round accessibility to Long Lake Beach from Beach Drive to Town Road.

This project was also approved by the Littleton Conservation Commission and Disability Commission. Thank you to Highway for helping out with the curb connections and J. Scott Excavation for their hard work and beautiful job on the pathway. 

The construction work began on Tuesday, May 28th, 2024 and was completed on Monday, June 3rd, 2024.

  1. 1 LL Pathway installation 05.28.24 (2)
  2. 2 LL Pathway installation 05.28.24
  3. 3 PXL_20240531_154132127
  4. 4 Long Lake Beach Pathway
  5. 5 Long Lake Beach Pathway
  6. 6 Long Lake Beach Pathway
  7. 7 Long Lake Beach Pathway
  8. 8 Long Lake Beach Pathway